EPSG
IOGP
2020-08-09
enter as appropriate: seismic data acquisition / processing / interpretation
Example datum to support bin grid CRSs created without reference to a map grid. Not required for bin grids defined with respect to a map grid as the geodetic datum is then inherited from the projected CRS on which the bin grid is based.